Petrobras and ESSS Energy cut drilling costs by US$ 333 million via real-time monitoring

Discover how the companies operated a simulation-based drilling digital twin for 10 years across over 600 wells

Share this

Faced with increasing pressure to reduce non-productive time (NPT) and ensure safety in complex operational environments, Petrobras recognized the need to innovate in its monitoring methodologies. Reactive conventional tools and fragmented data required a solution that went beyond traditional analytics to anticipate downhole issues.

The answer was the adoption of a simulation-based drilling digital twin, which has become a fundamental pillar, redefining the engineering workflow from reactive maintenance to predictive decision-making.

By using a hybrid solution that anchors machine learning (LSTM) in rigorous physics-based models, the partnership not only expanded its know-how in detecting anomalies like washouts and casing wear but also achieved tangible results. This includes the optimization of well delivery, which generated significant cascading savings of US$ 333 million, and the continuous improvement of sustainability metrics across a 10-year journey.

Challenge 

Petrobras needed a proactive, data-driven approach to anticipate downhole issues and reduce non-productive time (NPT) in high-stakes drilling operations, where conventional tools lacked predictive capability.

Solution 

The partnership implemented a simulation-based drilling digital twin, anchored in rigorous physics models and machine learning. Operated by a 24/7 expert team, the solution was integrated into the decision-making flow to validate data accuracy in real time.

Key results 

The initiative resulted in US$ 333 million in cost savings as a result of 488 rig days saved across 600+ wells. The project not only optimized costs but also accelerated well delivery and advanced sustainability goals, significantly reducing the carbon footprint per barrel.

  • solutions

    • Production and Transport

    • Drilling and Completion

    • Reservoir Engineering

  • services

    • Real-time monitoring

    • Flow assurance consulting

    • Pipeline leak detection

    • Reservoir souring and geochemistry

    • Custom software development

  • RESOURCE CENTER

    • News

    • Technical Library

    • Blog

  • COMPANY

    • About Us

    • Academic collaboration

Social

linked-in linked-in

© 2026 ESSS. All rights reserved